Home

San Andres de Boboke

Características del proyecto
Nombre del Proyecto: 
San Andres de Boboke
Fecha de finalización: 
1989
Numero de personas beneficiadas: 
85
Número de familias: 
0
Fondos
Costo (US$): 
0
Monto ya costeado: 
0
Located North of Rio Blanco, this village was under frequent attack by the Contra forces during the construction of the water project. At the end of the war it was selected as a center for the demobilization of the Contras because of its water system which is sufficient for a population two to three times its original size.
Ubicación
Javascript is required to view this map.